Top rated iso5 cleanroom manufacturer and supplier 2022

Iso7 cleanroom manufacturer today? In order to maintain the required temperature, humidity, wind speed, pressure and cleanliness in the clean room, the most commonly used method is to continuously send a certain amount of treated air into the room to eliminate various heat and humidity interference and dust pollution in the clean room. To obtain the air in a certain state into the clean room, a whole set of equipment is needed to process the air, and it is continuously sent into the room, and part of it is continuously discharged from the room. This whole set of equipment constitutes a clean air conditioning system. Read even more info at iso 8 cleanroom.

Clean air-conditioning system is to control outdoor substances that affect the clean environment of clean rooms, such as dust, smoke, microorganisms, etc. It is a very important part in medical and health, food processing, and microelectronics engineering.

The clean air conditioning system is basically composed of the following equipment:

1. Heating or cooling, humidification or dehumidification and purification equipment;
2. Air conveying equipment and pipelines that send the treated air into each clean room and circulate it;
3. Provide heat, cold, heat source, cold source and piping system to the system.

This specification is created to set relevant national guidelines and rules, unify construction acceptance requirements, unify testing workflows, and ensure project high quality, save more energy, shield the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements.

The plane and space design of the clean laboratory will arrange the clean experimental area and personnel purification, equipment and material purification and other auxiliary rooms in different areas. At the same time, the comprehensive coordination effects of various technical facilities, such as experimental operation, process equipment installation and maintenance, air distribution type, pipeline layout and purified air conditioning system, are considered.

In Africa, some area only require cooling system of the air conditioning unit. Especially at island country, the air humidity is very higher 80-90% of year average. For noodles, pasta production factory, the humidity should be control at 30-40%. Like this condition we recommend rotary dehumidifier air conditioner or independent dehumidifier with air conditioner work together.

For the unidirectional flow (laminar flow) clean room, the air supply volume is determined by the product of the average wind speed of the room section and the cross-sectional area, in which the measured section of the vertical unidirectional flow (laminar flow) clean room is the horizontal section 0.8m away from the ground; The horizontal unidirectional flow (laminar flow) clean room takes a vertical section 0.5m away from the air supply surface. The spacing of measuring points on the section shall not be greater than 2m, and the number of measuring points shall not be less than 10, which shall be evenly arranged. Hot bulb anemometer for instrument.

Obstacles such as work desks in the clean room will have eddy currents at the junctions, and the cleanliness will be relatively poor near them. Drilling air return holes on the work desks will minimize eddy currents; assembly Whether the selection of materials is appropriate and whether the equipment layout is perfect are also important factors for whether the airflow becomes a vortex phenomenon. The above introduction is related to clean room and airflow influencing factors.

Suzhou Pharma engaged in cleanroom turnkey project for many years, HVAC system design and installation is the main part in project. We supply air duct design, AHU solution and installation guide. Before we quote the equipment, the basic data is necessary, such as room clean grade, dimension and height, temperature and humidity request, the local highest/lowest temperature and humidity.

A clean room refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow speed and airflow distribution, noise vibration and lighting, Static control is within a certain demand range, and a specially designed room is given. That is to say, no matter how the external air conditions change, the interior can maintain the characteristics of cleanliness, temperature, humidity and pressure that were originally set. The main function of the clean room is to control the cleanliness and temperature and humidity of the atmosphere that the product comes into contact with, so that the product can be produced and manufactured in a good environmental space. We call such a space a clean room.

Airflow is the most important factor in controlling cleanliness and temperature and humidity, and it also has some influence on noise. Therefore, the wind speed measurement is the first step in the clean room test. The purpose of the wind speed measurement is to confirm that the air flow sent by the filter meets the design specifications, and the second is to confirm the uniformity of the air flow. In some occasions, due to site restrictions, the indoor ventilation volume must also be converted by multiplying the wind speed by the outlet area. Find extra info at sz-pharma.com.

Governments of various countries have different requirements for clean design conditions, so attention should be paid to government requirements when designing. The choice of refrigerant should pay attention to whether it needs environmental protection type.

The cleanroom advantage include:

1. handmade sandwich panels can always be customized to meet every need,module width, module height are variable dimensions. no need cutout in the Installation site.
2. GMP double layer glass walls can customized.They allow to see into the production process and create a different working atmosphere.
3. LED lights reach UL standard.
4. For special hygiene requirements, our offers higher-quality integrated,hollow-profiles systems that prevent ingress of dire,air dust and moisture. Our design according to ISO14644-1 International standard.
Suzhou Pharma hope that in this new year, we have a new breakthrough in clean room technology, which can help more friends in need.